Temporary works register template

For people coordinating temporary works information. Record management arrangements, temporary works items and changes and interfaces. Try the form below, see every question or download a blank PDF or Word copy.

Ready to use from the form library, and every question is yours to edit. Trial from £1, cancel any time.

Try it on your phone

Try it on this phone

Fill in the temporary works register on your phone now

See how the temporary works register looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

Prefer paper? Download a printable copy: PDF or Word

One email, and we won't add you to a mailing list.

How should temporary works be managed?

HSE says temporary works need planning and management. Structures must withstand foreseeable loads and be used for their intended purpose. A coordinator is an effective management approach, but HSE does not prescribe one universal management arrangement.

Last updated . Facts checked by the SiteSurvey team on 6 October 2026 against HSE temporary works and HSE CDM 2015 guidance.

Try the temporary works register form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Temporary Works RegisterOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed.

Want to see one filled in? See a completed temporary works register report (PDF), made by SiteSurvey from a fictional site visit.

Fill it in on a phone or tablet

Your team completes the temporary works register on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.

Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.

The Temporary Works Register form in the SiteSurvey app on a tablet
The Temporary Works Register form in the SiteSurvey app on a phone

Every question in the temporary works register template

A temporary works register linking each item to its design brief, design checks, inspections, load or use releases, changes and dismantling authority. 5 sections and 31 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Site or premises address: the site address, from the space or the project
  • Client or organisation: the project's customer

Record details and scope

  • ProjectShort answer

    Filled in from the project in SiteSurvey.

    Fills in from the project name
  • Site or premises addressShort answer
    Fills in from the site address, from the space or the project
  • Client or organisationShort answer
    Fills in from the project's customer
  • Record date*Date
  • Person completing the record*Short answer
  • CheckThis is a coordination register, not a temporary works design, design-check certificate, inspection report or permit to load or dismantle.
  • CheckHSE says temporary works need planning and management. Structures must withstand foreseeable loads and be used for their intended purpose. A coordinator is an effective management approach, but HSE does not prescribe one universal management arrangement.

Management arrangements

  • Project and temporary works scope*Short answer
  • Management procedure and revision*Short answer
  • Responsible coordinator or appointed role*Short answer
  • Authority and escalation arrangementsShort answer

Temporary works items

  • Temporary works item
    Repeat for each temporary works item. Each one asks:
    • Item ID, type and location*Short answer
    • Design brief and design revision*Short answer
    • Designer and design checkerShort answer
    • Required check category and check evidence referenceShort answer
    • Installation inspection referenceShort answer
    • Current stage*Choose one
      • Design pending
      • Installation
      • Awaiting release
      • In use
      • Dismantled
    • Separate load or use release reference*Short answer
      Shown when “Current stage” is “In use”
    • Dismantling authority and completion reference*Short answer
      Shown when “Current stage” is “Dismantled”

Changes and interfaces

  • Changes, revised designs and withdrawn releasesNotes
  • Plant loads, adjacent work and other interfacesNotes

    Identify where temporary works depend on another item, sequence or approval. Link the register entries so the dependency remains visible.

  • Register review date and reviewerShort answer

Actions and review

  • Are further actions required?*Choose one
    • Yes
    • No
  • Further action
    Repeat for each further action. Each one asks:
    Shown when “Are further actions required?” is “Yes”
    • Action and evidence reference*Notes
    • Person responsible*Short answer
    • Target dateDate
    • Action status*Choose one
      • Open
      • In progress
      • Completed
    • Completion evidence*Notes
      Shown when “Action status” is “Completed”
  • Outstanding limitations and information to pass onNotes
  • Record status*Choose one
    • Ready for review
    • Further work needed
    • Work or use stopped
  • Reviewed byShort answer
  • Review dateDate
  • Author signature*Signature
  • CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.

Scope and responsibility

This is a coordination register, not a temporary works design, design-check certificate, inspection report or permit to load or dismantle.

What a useful entry looks like

Plant loads, adjacent work and other interfaces

Identify where temporary works depend on another item, sequence or approval. Link the register entries so the dependency remains visible.

Item TW-12 depends on the release of item TW-08. The coordinator has recorded the required review before the next planned stage.

Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.

See it filled in

A completed temporary works register report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Temporary Works Register FAQs

How should I record “Plant loads, adjacent work and other interfaces”?

Identify where temporary works depend on another item, sequence or approval. Link the register entries so the dependency remains visible.

Does a register entry permit loading?

No. It links the separate release issued under the project procedure.

Does every item use the same design-check category?

No. Record the category determined under the applicable procedure and its supporting evidence.

What if the design changes after release?

Record the change and follow the project’s review and reauthorisation process before affected use continues.

What are the limits of this template?

This is a coordination register, not a temporary works design, design-check certificate, inspection report or permit to load or dismantle.

Can I complete this form on site and share the record?

In the SiteSurvey app the form works offline, with signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.