Solar site survey checklist

For surveyors gathering information for a solar installation design. Record proposal and access, roof and surroundings and installation interfaces. Try the form below, see every question or download a blank PDF or Word copy.

Ready to use from the form library, and every question is yours to edit. Trial from £1, cancel any time.

Try it on your phone

Try it on this phone

Fill in the solar installation site survey on your phone now

See how the solar installation site survey looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

Prefer paper? Download a printable copy: PDF or Word

One email, and we won't add you to a mailing list.

What safety issues affect a solar survey?

HSE roof-work guidance requires planning for falls and fragile surfaces. Government solar fire research also identifies installation-related issues. Survey information must feed competent design and safe installation planning.

Last updated . Facts checked by the SiteSurvey team on 6 October 2026 against HSE roof work and Government research on solar panel fire incidents.

Try the solar installation site survey form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Solar Installation Site SurveyOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed.

Want to see one filled in? See a completed solar installation site survey report (PDF), made by SiteSurvey from a fictional site visit.

Fill it in on a phone or tablet

Your team completes the solar installation site survey on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.

Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.

The Solar Installation Site Survey form in the SiteSurvey app on a tablet
The Solar Installation Site Survey form in the SiteSurvey app on a phone

Every question in the solar installation site survey template

A solar installation survey recording roof observations, shading, access, electrical interfaces, design information gaps and specialist review needs. 6 sections and 32 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Site or premises address: the site address, from the space or the project
  • Client or organisation: the project's customer

Record details and scope

  • ProjectShort answer

    Filled in from the project in SiteSurvey.

    Fills in from the project name
  • Site or premises addressShort answer
    Fills in from the site address, from the space or the project
  • Client or organisationShort answer
    Fills in from the project's customer
  • Record date*Date
  • Person completing the record*Short answer
  • CheckThis is a preliminary site evidence record, not structural approval, an electrical design, generation forecast, planning consent or permission to access a roof.
  • CheckHSE roof-work guidance requires planning for falls and fragile surfaces. Government solar fire research also identifies installation-related issues. Survey information must feed competent design and safe installation planning.

Proposal and access

  • Proposed array area and client requirements*Short answer
  • Site plan and roof drawing referenceShort answer
  • Survey access method and excluded areas*Notes
  • Roof age, construction and available recordsShort answer

Roof and surroundings

  • Roof or site area
    Repeat for each roof or site area. Each one asks:
    • Area ID and orientation*Short answer
    • Observed dimensions, pitch and measurement methodShort answer
    • Visible condition and fragility concerns*Notes
    • Obstructions, shading and observation timeNotes
    • Area photos from safe accessPhotos

Installation interfaces

  • Structural assessment needed and engineer reference*Notes
  • Supply, meter, equipment location and cable route observationsNotes
  • Fire access, separation and emergency information to resolveNotes
  • Planning, building control and network permission referencesNotes

Design handover

  • Missing information and specialist surveys*Notes

    Identify information the designer still needs and distinguish measured facts from assumptions. Refer structural and electrical decisions to the appropriate competent person.

  • Designer receiving the surveyShort answer
  • Constraints to carry into designNotes

Actions and review

  • Are further actions required?*Choose one
    • Yes
    • No
  • Further action
    Repeat for each further action. Each one asks:
    Shown when “Are further actions required?” is “Yes”
    • Action and evidence reference*Notes
    • Person responsible*Short answer
    • Target dateDate
    • Action status*Choose one
      • Open
      • In progress
      • Completed
    • Completion evidence*Notes
      Shown when “Action status” is “Completed”
  • Outstanding limitations and information to pass onNotes
  • Record status*Choose one
    • Ready for review
    • Further work needed
    • Work or use stopped
  • Reviewed byShort answer
  • Review dateDate
  • Author signature*Signature
  • CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.

Scope and responsibility

This is a preliminary site evidence record, not structural approval, an electrical design, generation forecast, planning consent or permission to access a roof.

What a useful entry looks like

Missing information and specialist surveys

Identify information the designer still needs and distinguish measured facts from assumptions. Refer structural and electrical decisions to the appropriate competent person.

Roof construction evidence and the proposed connection details remain unconfirmed. These gaps are listed for the design team's review before design completion.

Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.

See it filled in

A completed solar installation site survey report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Solar Installation Site Survey FAQs

How should I record “Missing information and specialist surveys”?

Identify information the designer still needs and distinguish measured facts from assumptions. Refer structural and electrical decisions to the appropriate competent person.

Does this calculate panel output?

No. It records inputs and constraints. Energy modelling and array design require a separate design process.

Can roof strength be confirmed visually?

No. Record the evidence and structural review required; visual observations do not prove load capacity.

How is this different from solar maintenance?

It concerns a proposed installation and design handover, rather than servicing an installed array.

What are the limits of this template?

This is a preliminary site evidence record, not structural approval, an electrical design, generation forecast, planning consent or permission to access a roof.

Can I complete this form on site and share the record?

In the SiteSurvey app the form works offline, with photos and signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.

Related

Use this solar installation site survey form with your team

Add it from the form library in one click, change any question, and every completed form becomes a branded PDF report.

Start your trial →