Skip to main content

Form library · Facilities and maintenance

Solar panel maintenance checklist

For people maintaining solar installations within an authorised scope. Record equipment and work, array and access and condition and performance. Try the form below, see every question or download a blank PDF or Word copy.

Ready to use from the form library, and every question is yours to edit. Trial from £1, cancel any time.

Try it on your phone

Try it on this phone

Fill in the solar panel maintenance on your phone now

See how the solar panel maintenance looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

Prefer paper? Download a printable copy: PDF or Word

One email, and we won't add you to a mailing list.

What safety information matters for solar PV maintenance?

Government solar PV fire research identifies risks associated with PV systems, while HSE requires suitable electrical maintenance arrangements. Use competent people, system documentation and a safe method for the actual installation.

Last updated . Facts checked by the SiteSurvey team on 6 October 2026 against Government research on fire incidents involving solar panels and HSE maintaining electrical equipment safety.

Try the solar panel maintenance form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Solar Panel MaintenanceOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed.

Want to see one filled in? See a completed solar panel maintenance report (PDF), made by SiteSurvey from a fictional site visit.

Fill it in on a phone or tablet

Your team completes the solar panel maintenance on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.

Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.

The Solar Panel Maintenance form in the SiteSurvey app on a tablet
The Solar Panel Maintenance form in the SiteSurvey app on a phone

Every question in the solar panel maintenance template

A solar PV maintenance record with array identification, safe access, visible module and cable condition, inverter information and specialist test references. 6 sections and 41 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Site or premises address: the site address, from the space or the project
  • Client or organisation: the project's customer
  • Manufacturer, model and serial number: the product's model

Record details and scope

  • ProjectShort answer

    Filled in from the project in SiteSurvey.

    Fills in from the project name
  • Site or premises addressShort answer
    Fills in from the site address, from the space or the project
  • Client or organisationShort answer
    Fills in from the project's customer
  • Record date*Date
  • Person completing the record*Short answer
  • CheckThis is a maintenance evidence record, not electrical design or isolation instructions. PV circuits can remain energised in daylight; switching off an inverter is not proof that every circuit is dead.
  • CheckGovernment solar PV fire research identifies risks associated with PV systems, while HSE requires suitable electrical maintenance arrangements. Use competent people, system documentation and a safe method for the actual installation.

Equipment and work

  • Solar PV system asset ID and location*Short answer
  • Manufacturer, model and serial number*Short answer
    Fills in from the product's model
  • Maintenance procedure and revision*Short answer
  • Technician and competence reference*Short answer
  • Planned work and exclusions*Notes
  • Safe isolation or permit reference*Short answer

Array and access

  • Array locations, module type and system capacityShort answer
  • Inverter identifiers and firmware or alarm referencesShort answer
  • Roof access, edge protection and access-plan reference*Short answer
  • Areas inaccessible or excluded from inspectionNotes

    Identify inaccessible areas and tests not performed. Keep a visual observation separate from an electrical or structural conclusion.

Condition and performance

  • Visible module damage and soiling recorded*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Mounting and roof interface observations recorded from safe access*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Visible cables, connectors and labels checked within authorised scope*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Inverter alarms and monitoring data reviewed*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Generation reading, period and comparison basisShort answer
  • Specialist electrical test report referencesNotes

Work and handback

  • Work performed and parts usedNotes
  • Post-work tests and evidenceNotes
  • Equipment handback*Choose one
    • Available within recorded limits
    • Restricted use
    • Out of service
  • Restrictions, isolation and person informed*Notes
    Shown only when the answers above make it relevant
  • Condition and work evidence photosPhotos

Actions and review

  • Are further actions required?*Choose one
    • Yes
    • No
  • Further action
    Repeat for each further action. Each one asks:
    Shown when “Are further actions required?” is “Yes”
    • Action and evidence reference*Notes
    • Person responsible*Short answer
    • Target dateDate
    • Action status*Choose one
      • Open
      • In progress
      • Completed
    • Completion evidence*Notes
      Shown when “Action status” is “Completed”
  • Outstanding limitations and information to pass onNotes
  • Record status*Choose one
    • Ready for review
    • Further work needed
    • Work or use stopped
  • Reviewed byShort answer
  • Review dateDate
  • Author signature*Signature
  • CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.

Scope and responsibility

This is a maintenance evidence record, not electrical design or isolation instructions. PV circuits can remain energised in daylight; switching off an inverter is not proof that every circuit is dead.

What a useful entry looks like

Areas inaccessible or excluded from inspection

Identify inaccessible areas and tests not performed. Keep a visual observation separate from an electrical or structural conclusion.

North roof-edge modules were not accessed. Observations were made from the agreed position; electrical testing is recorded only where separately authorised.

Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.

See it filled in

A completed solar panel maintenance report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Solar Panel Maintenance FAQs

How should I record “Areas inaccessible or excluded from inspection”?

Identify inaccessible areas and tests not performed. Keep a visual observation separate from an electrical or structural conclusion.

Does switching off the inverter isolate the array?

Do not assume so. Follow the installation-specific safe working method and competent electrical advice.

Can I attach thermal or electrical results?

Record the report reference and supporting images, with test conditions and limitations. The template does not interpret specialist test results.

Does this replace a roof inspection?

No. Record visible concerns and refer roof integrity or structural questions for appropriate assessment.

What are the limits of this template?

This is a maintenance evidence record, not electrical design or isolation instructions. PV circuits can remain energised in daylight; switching off an inverter is not proof that every circuit is dead.

Can I complete this form on site and share the record?

In the SiteSurvey app the form works offline, with photos and signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.

Related

Use this solar panel maintenance form with your team

Add it from the form library in one click, change any question, and every completed form becomes a branded PDF report.

Start your trial →