Skip to main content

Form library · Health and safety

Working at height rescue plan template

For people planning and reviewing rescue from work at height. Record work and scenarios, response arrangements and readiness. Try the form below, see every question or download a blank PDF or Word copy.

Ready to use from the form library, and every question is yours to edit. Trial from £1, cancel any time.

Try it on your phone

Try it on this phone

Fill in the work at height rescue plan record on your phone now

See how the work at height rescue plan record looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

Prefer paper? Download a printable copy: PDF or Word

One email, and we won't add you to a mailing list.

Must rescue be planned before work at height?

HSE states that work-at-height planning must include emergencies and rescue and should not rely entirely on emergency services. Plans need competent people, suitable equipment and arrangements for the actual work location.

Last updated . Facts checked by the SiteSurvey team on 6 October 2026 against HSE work at height and rescue planning and HSE working at height brief guide.

Try the work at height rescue plan record form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Work at Height Rescue Plan RecordOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed.

Want to see one filled in? See a completed work at height rescue plan record report (PDF), made by SiteSurvey from a fictional site visit.

Fill it in on a phone or tablet

Your team completes the work at height rescue plan record on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.

Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.

The Work at Height Rescue Plan Record form in the SiteSurvey app on a tablet
The Work at Height Rescue Plan Record form in the SiteSurvey app on a phone

Every question in the work at height rescue plan record template

A work-at-height rescue planning record linking credible scenarios, competent responders, approved methods, equipment readiness and briefing evidence. 6 sections and 33 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Site or premises address: the site address, from the space or the project
  • Client or organisation: the project's customer

Record details and scope

  • ProjectShort answer

    Filled in from the project in SiteSurvey.

    Fills in from the project name
  • Site or premises addressShort answer
    Fills in from the site address, from the space or the project
  • Client or organisationShort answer
    Fills in from the project's customer
  • Record date*Date
  • Person completing the record*Short answer
  • CheckThis records a site-specific plan for competent review. It is not a rescue technique manual, training qualification or permission to improvise rope or lifting systems.
  • CheckHSE states that work-at-height planning must include emergencies and rescue and should not rely entirely on emergency services. Plans need competent people, suitable equipment and arrangements for the actual work location.

Work and scenarios

  • Work location, height and access system*Short answer
  • Work risk assessment and approved method reference*Short answer
  • Credible rescue scenarios and access constraints*Notes
  • Competent plan author and rescue lead*Short answer

Response arrangements

  • Scenario response
    Repeat for each scenario response. Each one asks:
    • Scenario ID*Short answer
    • Approved rescue method reference*Short answer
    • Trained responders and availability*Short answer
    • Equipment, inspection and anchor verification references*Short answer
    • Access, exclusion and casualty transfer arrangements*Notes

Readiness

  • Alarm, communications and emergency-service coordination*Short answer
  • First-aid and receiving arrangements*Short answer
  • Rehearsal or validation evidence and limitations*Short answer

    Record the scenario exercised, people involved and limitations revealed. Keep the practice outcome separate from authorisation for the job.

  • Readiness decision*Choose one
    • Ready under approved plan
    • Not ready
  • Unresolved readiness gaps and work restriction*Notes
    Shown when “Readiness decision” is “Not ready”

Briefing

  • Briefed team and dateShort answer
  • Weather, personnel or equipment changes requiring review*Notes
  • Authorised review and approval referenceShort answer

Actions and review

  • Are further actions required?*Choose one
    • Yes
    • No
  • Further action
    Repeat for each further action. Each one asks:
    Shown when “Are further actions required?” is “Yes”
    • Action and evidence reference*Notes
    • Person responsible*Short answer
    • Target dateDate
    • Action status*Choose one
      • Open
      • In progress
      • Completed
    • Completion evidence*Notes
      Shown when “Action status” is “Completed”
  • Outstanding limitations and information to pass onNotes
  • Record status*Choose one
    • Ready for review
    • Further work needed
    • Work or use stopped
  • Reviewed byShort answer
  • Review dateDate
  • Author signature*Signature
  • CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.

Scope and responsibility

This records a site-specific plan for competent review. It is not a rescue technique manual, training qualification or permission to improvise rope or lifting systems.

What a useful entry looks like

Rehearsal or validation evidence and limitations

Record the scenario exercised, people involved and limitations revealed. Keep the practice outcome separate from authorisation for the job.

Rehearsal tested the recorded access and communication arrangements. A coordination gap was identified and assigned before the readiness decision.

Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.

See it filled in

A completed work at height rescue plan record report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Work at Height Rescue Plan Record FAQs

How should I record “Rehearsal or validation evidence and limitations”?

Record the scenario exercised, people involved and limitations revealed. Keep the practice outcome separate from authorisation for the job.

Is calling emergency services a complete plan?

No. HSE says not to rely entirely on emergency services; the site needs suitable rescue arrangements.

Does this tell an untrained person how to rescue someone?

No. It references approved methods and trained responders.

What if the nominated rescue team is unavailable?

Record Not ready and the work restriction until arrangements are resolved and reviewed.

What are the limits of this template?

This records a site-specific plan for competent review. It is not a rescue technique manual, training qualification or permission to improvise rope or lifting systems.

Can I complete this form on site and share the record?

In the SiteSurvey app the form works offline, with signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.

Related

Use this work at height rescue plan record form with your team

Add it from the form library in one click, change any question, and every completed form becomes a branded PDF report.

Start your trial →