Skip to main content

Form library · Construction and handover

Structural steel inspection checklist

For inspection teams recording steelwork before it is covered. Record inspection basis, member and connection records and hold points and review. Try the form below, see every question or download a blank PDF or Word copy.

Ready to use from the form library, and every question is yours to edit. Trial from £1, cancel any time.

Try it on your phone

Try it on this phone

Fill in the steelwork inspection on your phone now

See how the steelwork inspection looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

Prefer paper? Download a printable copy: PDF or Word

One email, and we won't add you to a mailing list.

What determines steelwork acceptance?

BCSA guidance explains the importance of specifications that reflect design requirements. Inspection must use the project’s specified criteria and inspection plan. A generic checklist cannot establish structural adequacy.

Last updated . Facts checked by the SiteSurvey team on 6 October 2026 against BCSA guidance on steelwork quality and specification and TWI visual inspection of welds.

Try the steelwork inspection form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Steelwork InspectionOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed.

Want to see one filled in? See a completed steelwork inspection report (PDF), made by SiteSurvey from a fictional site visit.

Fill it in on a phone or tablet

Your team completes the steelwork inspection on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.

Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.

The Steelwork Inspection form in the SiteSurvey app on a tablet
The Steelwork Inspection form in the SiteSurvey app on a phone

Every question in the steelwork inspection template

A steelwork inspection record linking member marks, drawing revisions, connection and coating observations, hold points, deviations and review evidence. 5 sections and 33 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Site or premises address: the site address, from the space or the project
  • Client or organisation: the project's customer

Record details and scope

  • ProjectShort answer

    Filled in from the project in SiteSurvey.

    Fills in from the project name
  • Site or premises addressShort answer
    Fills in from the site address, from the space or the project
  • Client or organisationShort answer
    Fills in from the project's customer
  • Record date*Date
  • Person completing the record*Short answer
  • CheckFor competent construction quality inspection. This is not structural design approval, a temporary stability assessment or certification of concealed work.
  • CheckBCSA guidance explains the importance of specifications that reflect design requirements. Inspection must use the project’s specified criteria and inspection plan. A generic checklist cannot establish structural adequacy.

Inspection basis

  • Walk Cam: steelwork walk-roundWalk Cam video with voice-to-text

    Optional. Film a guided walk-through on the SiteSurvey app.

  • Structure, level and grid location*Short answer
  • Approved drawings and revisions*Short answer
  • Inspection plan, hold point and specification*Short answer
  • Inspector and competence reference*Short answer

Member and connection records

  • Steelwork item
    Repeat for each steelwork item. Each one asks:
    • Member or connection mark*Short answer
    • Material and traceability referencesShort answer
    • Dimensions, alignment, fixing or coating checks performed*Notes
    • Acceptance criterion and drawing clause*Short answer
    • Actual findings or measurements with units*Notes
    • Result*Choose one
      • Meets recorded criterion
      • Deviation
      • Not inspected
    • Weld or bolt test report referenceShort answer
    • Supporting photosPhotos

Hold points and review

  • Non-conformance and engineer response referencesNotes
  • Work not visible or awaiting inspectionNotes

    Identify the connection or member, drawing revision and evidence captured before concealment. Record any missed inspection as a limitation.

  • Authorised hold-point release referenceShort answer
  • Reinspection evidenceNotes

Actions and review

  • Are further actions required?*Choose one
    • Yes
    • No
  • Further action
    Repeat for each further action. Each one asks:
    Shown when “Are further actions required?” is “Yes”
    • Action and evidence reference*Notes
    • Person responsible*Short answer
    • Target dateDate
    • Action status*Choose one
      • Open
      • In progress
      • Completed
    • Completion evidence*Notes
      Shown when “Action status” is “Completed”
  • Outstanding limitations and information to pass onNotes
  • Record status*Choose one
    • Ready for review
    • Further work needed
    • Work or use stopped
  • Reviewed byShort answer
  • Review dateDate
  • Author signature*Signature
  • CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.

Scope and responsibility

For competent construction quality inspection. This is not structural design approval, a temporary stability assessment or certification of concealed work.

What a useful entry looks like

Work not visible or awaiting inspection

Identify the connection or member, drawing revision and evidence captured before concealment. Record any missed inspection as a limitation.

Connection C-14 referenced to drawing S-08 revision C. Photographs and measurement sheet filed before the area is covered.

Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.

See it filled in

A completed steelwork inspection report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Steelwork Inspection FAQs

How should I record “Work not visible or awaiting inspection”?

Identify the connection or member, drawing revision and evidence captured before concealment. Record any missed inspection as a limitation.

Can the checklist approve a changed connection?

No. Record the deviation and obtain the authorised design response.

Are bolt torques provided?

No. Use the specified connection system, installation procedure and project criteria.

How is concealed work handled?

Record it as not inspected and link prior evidence or the required further inspection. Do not infer a pass.

What are the limits of this template?

For competent construction quality inspection. This is not structural design approval, a temporary stability assessment or certification of concealed work.

Can I complete this form on site and share the record?

In the SiteSurvey app the form works offline, with photos and signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.