Concrete pour checklist

For site teams recording concrete placement and follow-up. Record pour identification, pre-pour checks and placement record. Try the form below, see every question or download a blank PDF or Word copy.

Ready to use from the form library, and every question is yours to edit. Trial from £1, cancel any time.

Try it on your phone

Try it on this phone

Fill in the concrete pour inspection on your phone now

See how the concrete pour inspection looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

Prefer paper? Download a printable copy: PDF or Word

One email, and we won't add you to a mailing list.

What needs to be established before a pour?

HSE identifies falsework for concrete pours as temporary works requiring planning and management. Wet cement also presents health risks. Record design, inspection and safe-work evidence before proceeding under the project’s authorised process.

Last updated . Facts checked by the SiteSurvey team on 6 October 2026 against HSE temporary works and HSE cement health risks.

Try the concrete pour inspection form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Concrete Pour InspectionOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed.

Want to see one filled in? See a completed concrete pour inspection report (PDF), made by SiteSurvey from a fictional site visit.

Fill it in on a phone or tablet

Your team completes the concrete pour inspection on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.

Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.

The Concrete Pour Inspection form in the SiteSurvey app on a tablet
The Concrete Pour Inspection form in the SiteSurvey app on a phone

Every question in the concrete pour inspection template

A concrete pour record covering pre-pour evidence, reinforcement and formwork checks, delivery references, placement observations, curing and hold points. 6 sections and 40 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Site or premises address: the site address, from the space or the project
  • Client or organisation: the project's customer

Record details and scope

  • ProjectShort answer

    Filled in from the project in SiteSurvey.

    Fills in from the project name
  • Site or premises addressShort answer
    Fills in from the site address, from the space or the project
  • Client or organisationShort answer
    Fills in from the project's customer
  • Record date*Date
  • Person completing the record*Short answer
  • CheckThis is an inspection record, not falsework design, structural acceptance, a concrete mix approval or a laboratory strength report.
  • CheckHSE identifies falsework for concrete pours as temporary works requiring planning and management. Wet cement also presents health risks. Record design, inspection and safe-work evidence before proceeding under the project’s authorised process.

Pour identification

  • Walk Cam: pre-pour checkWalk Cam video with voice-to-text

    Optional. Film a guided walk-through on the SiteSurvey app.

  • Pour ID, location and planned volume*Short answer
  • Approved drawings, revisions and specification*Short answer
  • Specified mix and supplierShort answer
  • Inspection and test plan and hold points*Short answer

Pre-pour checks

  • Formwork and temporary works release referenced*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Reinforcement, cover and embedded items checked to design*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Construction joints and waterstops checked where specified*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Access, placement equipment and cement exposure controls ready*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Sampling, weather and curing arrangements confirmed*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant

Placement record

  • Delivery or placement record
    Repeat for each delivery or placement record. Each one asks:
    • Delivery ticket and batch*Short answer
    • Arrival and placement times*Short answer
    • Placement location*Short answer
    • Site tests and sample IDsShort answer
    • Delay, rejection or deviation and authorised decisionNotes
  • Pre-pour and placement evidencePhotos

Curing and follow-up

  • Curing and protection method and start time*Notes

    Record the specified curing arrangement, actual start and person responsible. Identify deviations from the agreed method.

  • Separate cube register and laboratory report referencesShort answer
  • Later stripping or loading authority referencesNotes

Actions and review

  • Are further actions required?*Choose one
    • Yes
    • No
  • Further action
    Repeat for each further action. Each one asks:
    Shown when “Are further actions required?” is “Yes”
    • Action and evidence reference*Notes
    • Person responsible*Short answer
    • Target dateDate
    • Action status*Choose one
      • Open
      • In progress
      • Completed
    • Completion evidence*Notes
      Shown when “Action status” is “Completed”
  • Outstanding limitations and information to pass onNotes
  • Record status*Choose one
    • Ready for review
    • Further work needed
    • Work or use stopped
  • Reviewed byShort answer
  • Review dateDate
  • Author signature*Signature
  • CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.

Scope and responsibility

This is an inspection record, not falsework design, structural acceptance, a concrete mix approval or a laboratory strength report.

What a useful entry looks like

Curing and protection method and start time

Record the specified curing arrangement, actual start and person responsible. Identify deviations from the agreed method.

Curing arrangement referenced to pour plan CP-07. Start time, responsible supervisor and any change from the plan are recorded for review.

Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.

See it filled in

A completed concrete pour inspection report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Concrete Pour Inspection FAQs

How should I record “Curing and protection method and start time”?

Record the specified curing arrangement, actual start and person responsible. Identify deviations from the agreed method.

Does this decide when formwork can be removed?

No. Record the authorised release and its engineering evidence separately.

Where are cube results kept?

Link the sample IDs to the cube register and issued laboratory reports. This form does not calculate concrete acceptance.

Can a failed pre-pour check be ignored?

Record the issue and obtain the required project decision before the affected work proceeds.

What are the limits of this template?

This is an inspection record, not falsework design, structural acceptance, a concrete mix approval or a laboratory strength report.

Can I complete this form on site and share the record?

In the SiteSurvey app the form works offline, with photos and signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.