Masonry inspection checklist

For people inspecting masonry against approved details. Record wall and design, workmanship checks and measured evidence and release. Try the form below, see every question or download a blank PDF or Word copy.

Ready to use from the form library, and every question is yours to edit. Trial from £1, cancel any time.

Try it on your phone

Try it on this phone

Fill in the masonry installation inspection on your phone now

See how the masonry installation inspection looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

Prefer paper? Download a printable copy: PDF or Word

One email, and we won't add you to a mailing list.

What should masonry inspection compare?

Approved Documents provide Building Regulations guidance for England. Record checks against the approved structural and construction details, with temporary stability managed under the project arrangements.

Last updated . Facts checked by the SiteSurvey team on 6 October 2026 against GOV.UK Approved Documents for England and HSE temporary works.

Try the masonry installation inspection form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Masonry Installation InspectionOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed.

Want to see one filled in? See a completed masonry installation inspection report (PDF), made by SiteSurvey from a fictional site visit.

Fill it in on a phone or tablet

Your team completes the masonry installation inspection on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.

Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.

The Masonry Installation Inspection form in the SiteSurvey app on a tablet
The Masonry Installation Inspection form in the SiteSurvey app on a phone

Every question in the masonry installation inspection template

A masonry installation record linking approved details, materials, setting out, ties, cavity observations, concealed work, defects and inspection hold points. 5 sections and 42 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Site or premises address: the site address, from the space or the project
  • Client or organisation: the project's customer

Record details and scope

  • ProjectShort answer

    Filled in from the project in SiteSurvey.

    Fills in from the project name
  • Site or premises addressShort answer
    Fills in from the site address, from the space or the project
  • Client or organisationShort answer
    Fills in from the project's customer
  • Record date*Date
  • Person completing the record*Short answer
  • CheckThis records construction quality observations, not structural design approval, a wall-load assessment, temporary support design or a guarantee of concealed workmanship.
  • CheckApproved Documents provide Building Regulations guidance for England. Record checks against the approved structural and construction details, with temporary stability managed under the project arrangements.

Wall and design

  • Wall, elevation and location ID*Short answer
  • Approved details and revision*Short answer
  • Units, mortar and component specification*Short answer
  • Lift/stage and hold point*Short answer

Workmanship checks

  • Setting out and dimensions checked against design*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Units and mortar records match specification*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Bond, joints and visible workmanship checked*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Ties, restraints and reinforcement evidenced before concealment*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Cavity, trays, DPC and weep details checked where specified*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Openings, lintels and movement joints checked against details*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Concealed-work photographsPhotos

Measured evidence and release

Record the location, measurement, units and specified criterion. Link evidence to the drawing revision used for the check.

  • Dimensional observation
    Repeat for each dimensional observation. Each one asks:
    • Measurement point and parameter*Short answer
    • Actual result and unit*Short answer
    • Acceptance criterion and source*Short answer
    • Instrument and calibration referenceShort answer
    • Comparison*Choose one
      • Within criterion
      • Outside criterion
      • Unable to assess
    • Exception and response*Notes
      Shown only when the answers above make it relevant
  • Temporary stability concerns and referralNotes
  • Defects and reinspection*Notes
  • Hold-point release referenceShort answer

Actions and review

  • Are further actions required?*Choose one
    • Yes
    • No
  • Further action
    Repeat for each further action. Each one asks:
    Shown when “Are further actions required?” is “Yes”
    • Action and evidence reference*Notes
    • Person responsible*Short answer
    • Target dateDate
    • Action status*Choose one
      • Open
      • In progress
      • Completed
    • Completion evidence*Notes
      Shown when “Action status” is “Completed”
  • Outstanding limitations and information to pass onNotes
  • Record status*Choose one
    • Ready for review
    • Further work needed
    • Work or use stopped
  • Reviewed byShort answer
  • Review dateDate
  • Author signature*Signature
  • CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.

Scope and responsibility

This records construction quality observations, not structural design approval, a wall-load assessment, temporary support design or a guarantee of concealed workmanship.

What a useful entry looks like

Dimensional observation

Record the location, measurement, units and specified criterion. Link evidence to the drawing revision used for the check.

Measurement at wall M-03 linked to detail D-12 revision A. Photograph and instrument reference retained with the actual recorded value.

Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.

See it filled in

A completed masonry installation inspection report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Masonry Installation Inspection FAQs

How should I record “Dimensional observation”?

Record the location, measurement, units and specified criterion. Link evidence to the drawing revision used for the check.

Does this give a standard tie spacing?

No. Record the approved design and actual evidence for the wall system.

Can photographs prove concealed compliance?

They support review but cannot establish matters outside the recorded view and inspection scope.

What if the wall appears unstable?

Record the concern and refer immediately through site safety and temporary works arrangements.

What are the limits of this template?

This records construction quality observations, not structural design approval, a wall-load assessment, temporary support design or a guarantee of concealed workmanship.

Can I complete this form on site and share the record?

In the SiteSurvey app the form works offline, with photos and signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.