Skip to main content

Form library · Construction and handover

Flooring inspection checklist

For installers and inspectors recording flooring substrate evidence. Record flooring system, substrate and environment and installation checks. Try the form below, see every question or download a blank PDF or Word copy.

Ready to use from the form library, and every question is yours to edit. Trial from £1, cancel any time.

Try it on your phone

Try it on this phone

Fill in the flooring installation inspection on your phone now

See how the flooring installation inspection looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

Prefer paper? Download a printable copy: PDF or Word

One email, and we won't add you to a mailing list.

What should acceptance be based on?

Approved Documents provide guidance for Building Regulations in England. Flooring acceptance also needs the project specification and manufacturer instructions; a checklist does not establish building control approval.

Last updated . Facts checked by the SiteSurvey team on 6 October 2026 against GOV.UK Approved Documents for England and HSE managing risks and risk assessment.

Try the flooring installation inspection form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Flooring Installation InspectionOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed.

Want to see one filled in? See a completed flooring installation inspection report (PDF), made by SiteSurvey from a fictional site visit.

Fill it in on a phone or tablet

Your team completes the flooring installation inspection on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.

Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.

The Flooring Installation Inspection form in the SiteSurvey app on a tablet
The Flooring Installation Inspection form in the SiteSurvey app on a phone

Every question in the flooring installation inspection template

A flooring installation record covering the specified system, substrate evidence, product batches, installation observations, defects and handover limits. 6 sections and 38 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Site or premises address: the site address, from the space or the project
  • Client or organisation: the project's customer

Record details and scope

  • ProjectShort answer

    Filled in from the project in SiteSurvey.

    Fills in from the project name
  • Site or premises addressShort answer
    Fills in from the site address, from the space or the project
  • Client or organisationShort answer
    Fills in from the project's customer
  • Record date*Date
  • Person completing the record*Short answer
  • CheckThis records installation quality against supplied criteria. It is not a structural assessment, universal moisture-test method, slip-resistance certificate or asbestos survey.
  • CheckApproved Documents provide guidance for Building Regulations in England. Flooring acceptance also needs the project specification and manufacturer instructions; a checklist does not establish building control approval.

Flooring system

  • Room, floor and area reference*Short answer
  • Finish, substrate and system specification*Short answer
  • Product batches and instruction revision*Short answer
  • Installer and inspection stageShort answer

Substrate and environment

  • Substrate moisture method, instrument and report referenceShort answer
  • Actual results and approved acceptance criteriaShort answer

    Record the test method, location, units and system-specific criterion. Avoid applying a result to areas that were not tested.

  • Preparation, repairs and compatibility evidence*Notes
  • Ambient and substrate conditionsShort answer

Installation checks

  • Layout and joints checked against design*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Adhesive or fixing records checked*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Levels, transitions and thresholds checked*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Surface defects and contamination recorded*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Protection and cure or access restrictions recorded*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Installation evidencePhotos

Handover

  • Defects, repairs and reinspection*Notes
  • Cleaning and maintenance instructions handed overShort answer
  • Authorised release and restrictionsShort answer

Actions and review

  • Are further actions required?*Choose one
    • Yes
    • No
  • Further action
    Repeat for each further action. Each one asks:
    Shown when “Are further actions required?” is “Yes”
    • Action and evidence reference*Notes
    • Person responsible*Short answer
    • Target dateDate
    • Action status*Choose one
      • Open
      • In progress
      • Completed
    • Completion evidence*Notes
      Shown when “Action status” is “Completed”
  • Outstanding limitations and information to pass onNotes
  • Record status*Choose one
    • Ready for review
    • Further work needed
    • Work or use stopped
  • Reviewed byShort answer
  • Review dateDate
  • Author signature*Signature
  • CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.

Scope and responsibility

This records installation quality against supplied criteria. It is not a structural assessment, universal moisture-test method, slip-resistance certificate or asbestos survey.

What a useful entry looks like

Actual results and approved acceptance criteria

Record the test method, location, units and system-specific criterion. Avoid applying a result to areas that were not tested.

Substrate result linked to test location F-06, instrument and method. Comparison uses the specified flooring system's documented criterion.

Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.

See it filled in

A completed flooring installation inspection report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Flooring Installation Inspection FAQs

How should I record “Actual results and approved acceptance criteria”?

Record the test method, location, units and system-specific criterion. Avoid applying a result to areas that were not tested.

Does one moisture limit suit every floor?

No. Record the method and criterion for the specified substrate and flooring system.

Does a smooth finish prove slip resistance?

No. Reference the required product or testing evidence separately.

What if an existing layer may contain asbestos?

Record the concern and stop disturbance pending the appropriate assessment; this is not an asbestos survey.

What are the limits of this template?

This records installation quality against supplied criteria. It is not a structural assessment, universal moisture-test method, slip-resistance certificate or asbestos survey.

Can I complete this form on site and share the record?

In the SiteSurvey app the form works offline, with photos and signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.

Related

Use this flooring installation inspection form with your team

Add it from the form library in one click, change any question, and every completed form becomes a branded PDF report.

Start your trial →