Form library · Construction and handover
Waterproofing inspection checklist
For people inspecting waterproofing before it is covered. Record system and area, installation checks and evidence and tests. Try the form below, see every question or download a blank PDF or Word copy.
Ready to use from the form library, and every question is yours to edit. Trial from £1, cancel any time.
Try it on your phone
Try it on this phone
Fill in the waterproofing installation inspection on your phone now
See how the waterproofing installation inspection looks on your phone
Scan the code with your phone camera. It opens the real form, no sign-up needed.
Open the live example and fill it in, just as your team would on site. No sign-up needed.
See it on this phoneEvery question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.
What establishes the required waterproofing performance?
Approved Document C provides guidance on resistance to moisture for buildings in England. The project design and specified system establish the details to inspect. A completed installation checklist does not itself demonstrate that all performance requirements are met.
Last updated . Facts checked by the SiteSurvey team on 6 October 2026 against GOV.UK Approved Documents for England and HSE designer duties.
Try the waterproofing installation inspection form live
Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.
This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed.
Want to see one filled in? See a completed waterproofing installation inspection report (PDF), made by SiteSurvey from a fictional site visit.
Fill it in on a phone or tablet
Your team completes the waterproofing installation inspection on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.
Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.


Every question in the waterproofing installation inspection template
A waterproofing installation record covering system specification, substrate, joints, penetrations, concealment evidence, authorised tests and repairs. 6 sections and 37 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.
Make it your own: every question is editable
This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.
Details you only enter once
Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.
- Project: the project name
- Site or premises address: the site address, from the space or the project
- Client or organisation: the project's customer
Record details and scope
- ProjectShort answer
Filled in from the project in SiteSurvey.
Fills in from the project name - Site or premises addressShort answerFills in from the site address, from the space or the project
- Client or organisationShort answerFills in from the project's customer
- Record date*Date
- Person completing the record*Short answer
- CheckThis is a quality record against a supplied design. It is not a waterproofing design, guaranteed watertightness statement, BS 8102 certification or authorisation to flood-test a structure.
- CheckApproved Document C provides guidance on resistance to moisture for buildings in England. The project design and specified system establish the details to inspect. A completed installation checklist does not itself demonstrate that all performance requirements are met.
System and area
- Area, level and waterproofing zone*Short answer
- System, manufacturer and batch references*Short answer
- Approved details and instruction revision*Short answer
- Installer and required competence referenceShort answer
Installation checks
- Substrate condition checked against system requirements*Choose one
- Acceptable
- Action needed
- Not checked
- Not applicable
- Action, limitation or reason not applicable*NotesShown only when the answers above make it relevant
- Joints, laps and terminations checked to specified details*Choose one
- Acceptable
- Action needed
- Not checked
- Not applicable
- Action, limitation or reason not applicable*NotesShown only when the answers above make it relevant
- Penetrations and waterstops inspected where applicable*Choose one
- Acceptable
- Action needed
- Not checked
- Not applicable
- Action, limitation or reason not applicable*NotesShown only when the answers above make it relevant
- Drainage or protection components checked where specified*Choose one
- Acceptable
- Action needed
- Not checked
- Not applicable
- Action, limitation or reason not applicable*NotesShown only when the answers above make it relevant
- Damage and contamination checked before concealment*Choose one
- Acceptable
- Action needed
- Not checked
- Not applicable
- Action, limitation or reason not applicable*NotesShown only when the answers above make it relevant
Evidence and tests
- Details before concealmentPhotos
Identify the detail, location and evidence captured before covering. State any installation stage that was not observed.
- Authorised test procedure and separate structural approval if neededShort answer
- Tests actually performed, criteria and resultsNotes
- Areas not visible and limitations*Notes
Repair and release
- Defects, repairs and reinspection evidenceNotes
- Authorised concealment or handover referenceShort answer
- Separate warranty and maintenance document referencesShort answer
Actions and review
- Are further actions required?*Choose one
- Yes
- No
- Further actionRepeat for each further action. Each one asks:Shown when “Are further actions required?” is “Yes”
- Action and evidence reference*Notes
- Person responsible*Short answer
- Target dateDate
- Action status*Choose one
- Open
- In progress
- Completed
- Completion evidence*NotesShown when “Action status” is “Completed”
- Outstanding limitations and information to pass onNotes
- Record status*Choose one
- Ready for review
- Further work needed
- Work or use stopped
- Reviewed byShort answer
- Review dateDate
- Author signature*Signature
- CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.
Scope and responsibility
This is a quality record against a supplied design. It is not a waterproofing design, guaranteed watertightness statement, BS 8102 certification or authorisation to flood-test a structure.
What a useful entry looks like
Details before concealment
Identify the detail, location and evidence captured before covering. State any installation stage that was not observed.
Junction J-04 photographed and referenced to the approved system detail before covering. Unobserved areas are listed for the reviewer.
Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.
See it filled in
A completed waterproofing installation inspection report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.
Waterproofing Installation Inspection FAQs
How should I record “Details before concealment”?
Identify the detail, location and evidence captured before covering. State any installation stage that was not observed.
Can the form guarantee no leaks?
No. It records evidence within the inspected scope and identifies limitations.
Should all systems receive a flood test?
No. Test selection and loading must be approved for the actual design and structure.
Why capture evidence before concealment?
Later inspection may not reveal joints or penetrations. Link dated evidence to the specific area and detail.
What are the limits of this template?
This is a quality record against a supplied design. It is not a waterproofing design, guaranteed watertightness statement, BS 8102 certification or authorisation to flood-test a structure.
Can I complete this form on site and share the record?
In the SiteSurvey app the form works offline, with photos and signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.
Related
Related templates
Templates that go with the waterproofing installation inspection form
A balcony condition record covering safe access, visible surfaces, balustrades, drainage, distress indicators, evidence and referral for specialist review.
A window installation record linking opening IDs, product information, fixing and sealing observations, operation checks, defects and handover evidence.
A flooring installation record covering the specified system, substrate evidence, product batches, installation observations, defects and handover limits.