Drainage inspection checklist

For people recording installed drainage and handover information. Record installation scope, installation checks and testing and handover. Try the form below, see every question or download a blank PDF or Word copy.

Ready to use from the form library, and every question is yours to edit. Trial from £1, cancel any time.

Try it on your phone

Try it on this phone

Fill in the drainage installation inspection on your phone now

See how the drainage installation inspection looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

Prefer paper? Download a printable copy: PDF or Word

One email, and we won't add you to a mailing list.

What guidance applies to drainage installation?

Approved Document H provides drainage guidance for England. Use the applicable design, local requirements and approved inspection/test plan. HSE confined-space guidance applies where the work creates entry risks.

Last updated . Facts checked by the SiteSurvey team on 6 October 2026 against GOV.UK Approved Document H England and HSE confined space legal duties.

Try the drainage installation inspection form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Drainage Installation InspectionOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed.

Want to see one filled in? See a completed drainage installation inspection report (PDF), made by SiteSurvey from a fictional site visit.

Fill it in on a phone or tablet

Your team completes the drainage installation inspection on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.

Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.

The Drainage Installation Inspection form in the SiteSurvey app on a tablet
The Drainage Installation Inspection form in the SiteSurvey app on a phone

Every question in the drainage installation inspection template

A drainage installation record linking drawings, pipe and chamber observations, levels, concealed-work evidence, approved test references and defects. 5 sections and 41 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Site or premises address: the site address, from the space or the project
  • Client or organisation: the project's customer

Record details and scope

  • ProjectShort answer

    Filled in from the project in SiteSurvey.

    Fills in from the project name
  • Site or premises addressShort answer
    Fills in from the site address, from the space or the project
  • Client or organisationShort answer
    Fills in from the project's customer
  • Record date*Date
  • Person completing the record*Short answer
  • CheckThis is an installation inspection record, not a drainage test certificate, design approval, CCTV condition survey or chamber-entry permit.
  • CheckApproved Document H provides drainage guidance for England. Use the applicable design, local requirements and approved inspection/test plan. HSE confined-space guidance applies where the work creates entry risks.

Installation scope

  • Run, chamber and location references*Short answer
  • Approved design and revision*Short answer
  • Foul, surface or other system and boundaries*Short answer
  • Inspection stage and concealment hold points*Short answer

Installation checks

  • Materials and pipe sizes checked against design*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Bedding and support evidence recorded*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Connections and joints checked before concealment*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Levels, falls and flow direction checked against design*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Chambers, access and protection checked within safe access*Choose one
    • Acceptable
    • Action needed
    • Not checked
    • Not applicable
  • Action, limitation or reason not applicable*Notes
    Shown only when the answers above make it relevant
  • Level or dimensional check
    Repeat for each level or dimensional check. Each one asks:
    • Measurement point and parameter*Short answer
    • Actual result and unit*Short answer
    • Acceptance criterion and source*Short answer
    • Instrument and calibration referenceShort answer
    • Comparison*Choose one
      • Within criterion
      • Outside criterion
      • Unable to assess
    • Exception and response*Notes
      Shown only when the answers above make it relevant
  • Concealed-work evidencePhotos

Testing and handover

  • Approved test method and separate result/certificate referenceShort answer
  • Defects and retest or reinspection evidence*Notes
  • As-built record and handover recipientShort answer

    Identify changes from the approved layout and the corresponding as-built reference. Include concealed sections not witnessed as a limitation.

  • Untested or inaccessible sections*Notes

Actions and review

  • Are further actions required?*Choose one
    • Yes
    • No
  • Further action
    Repeat for each further action. Each one asks:
    Shown when “Are further actions required?” is “Yes”
    • Action and evidence reference*Notes
    • Person responsible*Short answer
    • Target dateDate
    • Action status*Choose one
      • Open
      • In progress
      • Completed
    • Completion evidence*Notes
      Shown when “Action status” is “Completed”
  • Outstanding limitations and information to pass onNotes
  • Record status*Choose one
    • Ready for review
    • Further work needed
    • Work or use stopped
  • Reviewed byShort answer
  • Review dateDate
  • Author signature*Signature
  • CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.

Scope and responsibility

This is an installation inspection record, not a drainage test certificate, design approval, CCTV condition survey or chamber-entry permit.

What a useful entry looks like

As-built record and handover recipient

Identify changes from the approved layout and the corresponding as-built reference. Include concealed sections not witnessed as a limitation.

Installed route differs at junction D-08. The change is marked on the handover drawing and linked to the inspection and test evidence.

Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.

See it filled in

A completed drainage installation inspection report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Drainage Installation Inspection FAQs

How should I record “As-built record and handover recipient”?

Identify changes from the approved layout and the corresponding as-built reference. Include concealed sections not witnessed as a limitation.

Does this prescribe an air-test pressure?

No. Reference the approved method and separately recorded test result.

How does it differ from the CCTV survey record?

It records installation-stage checks against design; the CCTV record links footage and observed drain condition.

Can a chamber be entered to complete it?

This record provides no entry authority. Record inaccessible areas and use the separately assessed process.

What are the limits of this template?

This is an installation inspection record, not a drainage test certificate, design approval, CCTV condition survey or chamber-entry permit.

Can I complete this form on site and share the record?

In the SiteSurvey app the form works offline, with photos and signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.