Form library · Manufacturing and quality

Job traveller template

Track a manufacturing job through its operation sequence, with material references, completed quantities, inspection evidence and outstanding work. View the questions, try the live form or download a blank PDF or Word copy.

Ready to use from the form library, and every question is yours to edit. Trial from £1, cancel any time.

Try it on your phone

Try it on this phone

Fill in the job traveller on your phone now

See how the job traveller looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

Prefer paper? Download a printable copy: PDF or Word

One email, and we won't add you to a mailing list.

What does this template record?

A job traveller accompanies a manufacturing job through an ordered sequence of operations. It records the part and drawing revision, material reference, operator, instruction revision, quantities, inspection evidence and any hold or rework. Use separate operation entries so the handover shows exactly where work stopped.

Last updated . Facts checked by the SiteSurvey team on 9 October 2026 against ScanPath job traveller template.

How to make this record useful

Hold or rework explanation

Operation 20, drilling: 18 completed and 2 held for hole-position review against drawing BR-4 revision C. Inspection record QC-402 covers the finding. The two held pieces are identified separately for the next operator.

Fictional example. Record the actual evidence and approved arrangements for your job.

A common recording mistake

Do not treat the sum of quantities from successive operations as the number of finished parts. The same pieces may pass through cutting, drilling and finishing; each count describes that operation.

What happens next

Record the rework or review decision and hand over the current operation status. Link first article or other inspection evidence by reference. This record does not provide live production scheduling or automatic product release.

Try the job traveller form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Job traveller templateOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed.

Want to see one filled in? See a completed job traveller report (PDF), made by SiteSurvey from a fictional site visit.

Every question in the job traveller template

Track a manufacturing job through its operation sequence, with material references, completed quantities, inspection evidence and outstanding work. 3 sections and 21 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project or site: the project name

Job and material

  • Project or site*Short answer
    Fills in from the project name
  • Record reference*Short answer
  • Record date*Date
  • Prepared by*Short answer
  • Part or product and drawing revision*Short answer
  • Planned job quantity*Number
  • Material lot and specification reference*Short answer

Operation records

  • Operation sequence
    Repeat for each entry. Each one asks:
    • Operation number and process*Short answer
    • Instruction revision*Short answer
    • Operator*Short answer
    • Operation date*Date
    • Completed quantity*Number
    • Rejected or rework quantity*Number
    • Operation status*Choose one
      • Complete
      • Held
      • Rework required
    • Hold or rework explanation*Notes
      Shown only when the answers above make it relevant
    • Inspection record reference*Short answer
  • GuidanceRetain material and operation references. This form records progress; it does not provide live production scheduling or regulated product release.

Handover and next action

  • Record status*Choose one
    • Open
    • Complete
  • Next action or reason none is needed*Notes
  • Responsible person*Short answer
  • Reviewed byShort answer
  • Reviewer acknowledgementSignature

See it filled in

A completed job traveller report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Job traveller FAQs

How does this differ from related templates?

This traveller follows a non-food manufacturing job through multiple operations. A work order owns the service request; food traceability owns food lots; first article inspection owns first-piece results.

Can I record rework?

Yes. Add the rework operation and its instruction reference, retain the earlier result and record the new quantity and inspection evidence.

Related

Use this job traveller form with your team

Add it from the form library in one click, change any question, and every completed form becomes a branded PDF report.