Construction submittal template

Record proposed materials or documents, their specification references and revisions, and the reviewer’s response. View the questions, try the live form or download a blank PDF or Word copy.

Ready to use from the form library, and every question is yours to edit. Trial from £1, cancel any time.

Try it on your phone

Try it on this phone

Fill in the construction submittal on your phone now

See how the construction submittal looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

Prefer paper? Download a printable copy: PDF or Word

One email, and we won't add you to a mailing list.

What does this template record?

Record proposed materials or documents, their specification references and revisions, and the reviewer’s response.

Last updated . Facts checked by the SiteSurvey team on 9 October 2026 against Jotform construction submittal form and Smartsheet submittal templates.

Try the construction submittal form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Construction submittal templateOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed.

Want to see one filled in? See a completed construction submittal report (PDF), made by SiteSurvey from a fictional site visit.

Every question in the construction submittal template

Record proposed materials or documents, their specification references and revisions, and the reviewer’s response. 4 sections and 29 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project or site: the project name

Submittal details

  • Project or site*Short answer
    Fills in from the project name
  • Record reference*Short answer
  • Record date*Date
  • Prepared by*Short answer
  • Reviewer or recipient*Short answer
  • Response required by*Date
  • Work package or location*Short answer

Proposed material or document

  • Specification clause and revision*Short answer
  • Drawing reference and revisionShort answer
  • Items submitted
    Repeat for each entry. Each one asks:
    • Item or product*Short answer
    • Manufacturer or document author*Short answer
    • Model or document reference*Short answer
    • Revision or issue date*Short answer
    • Supporting document references*Short answer
    • Intended use or location*Notes
  • Is a departure from the specification proposed?*Choose one
    • Yes
    • No
  • Proposed departure and reason*Notes
    Shown when “Is a departure from the specification proposed?” is “Yes”
  • Supporting product or site photosPhotos

Review record

  • Review status*Choose one
    • Awaiting review
    • Reviewed without comments
    • Reviewed with comments
    • Revise and resubmit
    • Not accepted
  • Review comments or decision evidence*Notes
    Shown only when the answers above make it relevant
  • Review recorded from*Short answer
    Shown only when the answers above make it relevant
  • Review date*Date
    Shown only when the answers above make it relevant
  • Previous submission referenceShort answer
  • Resubmission reference or planned revision*Short answer
    Shown only when the answers above make it relevant
  • GuidanceRecord the project reviewer’s actual response and any conditions. This record does not replace the project’s contractual approval or instruction procedure.

Next action

  • Next action or reason none is needed*Notes
  • Action owner*Short answer
  • Action due date*Date
  • Reviewed byShort answer
  • Reviewer acknowledgementSignature

See it filled in

A completed construction submittal report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Construction submittal FAQs

What should a construction submittal include?

Identify the project, work package, specification reference, proposed items, evidence revisions, reviewer and required response date. Retain comments and any resubmission reference.

How does a submittal differ from an RFI?

A submittal presents a proposed product or document for review. An RFI asks for clarification of missing or conflicting information.

Can I track a revised submission?

Yes. Record the previous submission reference and the next revision, then retain a separate record of each issue and response.

Does completing the form approve the material?

No. Record the named reviewer’s actual response and follow the project’s approval process before procurement or installation.