Skip to main content
Damp and Mould Inspection Checklist for Social Housing
Back to Insights
Part of: Awaab's Law: The Complete Guide for Social LandlordsGuide2026

Damp and Mould Inspection Checklist for Social Housing

A practical, room by room damp and mould inspection checklist for social landlords and contractors working to Awaab's Law, from before the visit to the written summary.

Posted on: September 25, 2026
Last updated: September 25, 2026

A damp and mould inspection under Awaab's Law has two jobs. It has to find out what is wrong and what will fix it. And it has to leave a record that shows, months later, exactly what was found, where, by whom and when.

This checklist covers both. Use it as the basis for your own inspection form and adapt it to your policy. It is general guidance, not legal or technical advice.

Before the Visit

  • The date the landlord became aware of the problem, and who reported it
  • The deadline for the investigation: 10 working days from that date, or 24 hours if it could be an emergency
  • What was reported, in the reporter's own words
  • Previous reports, inspections and works on the same property
  • What is known about the household: children, older people, health conditions, disability, pregnancy
  • Access arrangements, and a record of every attempt to arrange the visit

On Arrival

  • The date and time of arrival
  • Who is present, and whether the tenant has a representative
  • The tenant's account of the problem: where, how long, whether it is getting worse, any health effects
  • A note of the household's circumstances as they bear on the risk
  • Any other hazards noticed on the way in; from 30 November 2026, many more of them fall within Awaab's Law

Room by Room

Inspect every room, not just the one reported. For each room:

  • Whether there is damp or mould present
  • Exactly where: which wall, ceiling, window, corner or fitting
  • The extent, measured, not estimated
  • The type of problem: surface mould, damp staining, wet plaster, a leak
  • Photographs of each affected area, marked up to show the area and its size
  • Moisture meter readings on affected and unaffected surfaces
  • Relative humidity and temperature, and conditions outside
  • Ventilation: trickle vents, extractor fans present and working, windows that open
  • Heating: present, working and adequate for the room
  • Anything that points to a cause: a leaking pipe, a blocked gutter, missing insulation, a cold bridge, rising or penetrating damp, condensation
  • Damage to belongings, where relevant

Outside the Home

  • Gutters, downpipes and drainage
  • Roof, flashing and visible roof coverings
  • Brickwork, render and pointing
  • Damp proof course level and ground levels against the walls
  • Window and door seals
  • Neighbouring properties where a leak may come from above or next door

The Conclusion

  • The likely cause or causes, and what the conclusion is based on
  • Whether there is a significant hazard, an emergency hazard, or neither, and why
  • Whether a further investigation is needed to establish the cause or extent
  • The relevant safety work needed to make the home safe
  • Any supplementary preventative work needed to stop it returning
  • Whether the home can be made safe within the deadline, and if not, whether alternative accommodation is needed
  • Any advice given to the tenant

Condensation is a cause, not a conclusion. Government guidance on damp and mould is clear that landlords should not blame it on tenants' lifestyle. If condensation is the cause, record why it is happening in this home: ventilation, heating, insulation, occupancy.

Sign-Off

  • The inspector's name, role, and why they are competent to carry out the investigation
  • The date and time the inspection concluded, which starts the 3 working day deadline for the written summary and the 5 working day deadline for safety work
  • The tenant's acknowledgement, where appropriate

After the Visit

  • The written summary sent within 3 working days of the investigation concluding, with a copy kept
  • Works orders raised, with dates
  • Safety work completed within 5 working days, with photographs of the finished work
  • Supplementary preventative work begun, or steps taken to begin it, within 5 working days
  • Any delay recorded at the time, with the reason and what was done about it
  • A follow-up visit to check the problem has not returned

The full record keeping list, from the first report to the finished repair, is in what records Awaab's Law requires.

Turning This Checklist Into a Form

A checklist on paper tends to be completed differently by every inspector. A form on a phone asks the same questions in every room, in the same order, and ties each answer and photograph to the room it belongs to.

In SiteSurvey you can start from a ready-made damp and mould template and adapt it, or describe the form you want and have it built with AI, then edit any field. Findings sit against the room on a floor plan, photographs are marked up and measured on the spot, and every entry records who captured it and when, with or without signal. See the damp and mould inspection app.

Part of Complete Guide

Read the Complete Guide to Awaab's Law

Get the full picture with our comprehensive guide covering all aspects of this topic.

Read Complete Guide

Frequently Asked Questions

Q.What should a damp and mould inspection include?

Every room, not just the one reported: where the damp or mould is, how extensive it is, photographs, moisture and humidity readings, ventilation and heating, the likely cause, whether it is a significant or emergency hazard, and the work needed.

Q.Who can carry out a damp and mould inspection under Awaab's Law?

Someone the landlord reasonably considers competent to do it. The record should show who carried it out and why they were competent.

Q.Should every room be inspected?

Yes. Damp and mould reported in one room often has a cause, or a second patch, elsewhere in the home, and the investigation needs to establish the full extent of the problem.

Q.How soon must a damp and mould inspection happen?

Within 10 working days of the landlord becoming aware of a potential significant hazard, or within 24 hours if it could be an emergency hazard.

Start your project

Ready to see the whole site? Start your free 7-day trial today and put every survey detail in its place - from first capture to final report.