Pre construction information template

For clients and project teams assembling pre-construction information. Record project and responsibilities, information register and constraints and gaps. Try the form below, see every question or download a blank PDF or Word copy.

Ready to use from the form library, and every question is yours to edit. Trial from £1, cancel any time.

Try it on your phone

Try it on this phone

Fill in the pre-construction information record on your phone now

See how the pre-construction information record looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

Prefer paper? Download a printable copy: PDF or Word

One email, and we won't add you to a mailing list.

Who provides pre-construction information?

Under CDM 2015 in Great Britain, the commercial client provides relevant pre-construction information to designers and contractors. HSE describes the principal designer role in helping assemble it and providing the information others need to carry out their duties. The information must suit the project rather than being a generic document bundle.

Last updated . Facts checked by the SiteSurvey team on 6 October 2026 against HSE commercial client duties under CDM 2015 and HSE principal designer duties under CDM 2015.

Try the pre-construction information record form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Pre-construction Information RecordOpen full screen ↗
Fill it in right here

This is the real form as your team would use it: questions appear as you answer, scores work themselves out and you can add photos and signatures. No sign-up needed.

Want to see one filled in? See a completed pre-construction information record report (PDF), made by SiteSurvey from a fictional site visit.

Fill it in on a phone or tablet

Your team completes the pre-construction information record on site in the SiteSurvey app on iPhone, iPad and Android phones and tablets. The project name and address fill in for them, it works without signal, and it syncs when the device is back online with photos kept against the question they answer.

Customers and subcontractors do not need the app: send them a link and they can fill it in from any browser.

The Pre-construction Information Record form in the SiteSurvey app on a tablet
The Pre-construction Information Record form in the SiteSurvey app on a phone

Every question in the pre-construction information record template

A pre-construction information register with existing records, site constraints, significant risks, information gaps, recipients and issue revisions. 6 sections and 35 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Site or premises address: the site address, from the space or the project
  • Client or organisation: the project's customer

Record details and scope

  • ProjectShort answer

    Filled in from the project in SiteSurvey.

    Fills in from the project name
  • Site or premises addressShort answer
    Fills in from the site address, from the space or the project
  • Client or organisationShort answer
    Fills in from the project's customer
  • Record date*Date
  • Person completing the record*Short answer
  • CheckThis is an information register and gap record. It does not replace the underlying surveys, drawings, existing health and safety file or competent design coordination.
  • CheckUnder CDM 2015 in Great Britain, the commercial client provides relevant pre-construction information to designers and contractors. HSE describes the principal designer role in helping assemble it and providing the information others need to carry out their duties. The information must suit the project rather than being a generic document bundle.

Project and responsibilities

  • Project scope and intended work*Notes
  • Client contact responsible for information*Short answer
  • Principal designer or coordinating designerShort answer
  • Existing use, occupants and neighbouring activitiesNotes
  • Information issue and revisionShort answer

Information register

  • Information item
    Repeat for each information item. Each one asks:
    • Subject or risk addressed*Short answer
    • Document, drawing or survey referenceShort answer
    • Revision and dateShort answer
    • Availability*Choose one
      • Available
      • Requested
      • Missing
      • Not applicable
    • Scope, reliability and limitations*Notes
    • Person supplying or resolving itShort answer
    • Required-by dateDate

Constraints and gaps

  • Access, services, asbestos, structure and other significant constraints*Notes
  • Information gaps, implications and controls before workNotes

    State what information is missing, why the work needs it and who will obtain it. Do not record an assumption as a confirmed survey result.

  • Design coordination and contractor questionsNotes

Issue record

  • Recipient
    Repeat for each recipient. Each one asks:
    • Designer or contractor receiving information*Short answer
    • Information package and revision*Short answer
    • Date issuedDate
    • Acknowledgement, questions or further information neededNotes

Actions and review

  • Are further actions required?*Choose one
    • Yes
    • No
  • Further action
    Repeat for each further action. Each one asks:
    Shown when “Are further actions required?” is “Yes”
    • Action and evidence reference*Notes
    • Person responsible*Short answer
    • Target dateDate
    • Action status*Choose one
      • Open
      • In progress
      • Completed
    • Completion evidence*Notes
      Shown when “Action status” is “Completed”
  • Outstanding limitations and information to pass onNotes
  • Record status*Choose one
    • Ready for review
    • Further work needed
    • Work or use stopped
  • Reviewed byShort answer
  • Review dateDate
  • Author signature*Signature
  • CheckSigning records the information entered. It does not itself certify legal compliance, remove a limitation or authorise unsafe work.

Scope and responsibility

This is an information register and gap record. It does not replace the underlying surveys, drawings, existing health and safety file or competent design coordination.

What a useful entry looks like

Information gaps, implications and controls before work

State what information is missing, why the work needs it and who will obtain it. Do not record an assumption as a confirmed survey result.

Service route information for the proposed opening is missing. The design team requires verified information before finalising that detail.

Fictional example of record wording. Use the actual evidence and approved arrangements for your job; this is not a completed report or an instruction to carry out the work.

See it filled in

A completed pre-construction information record report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Pre-construction Information Record FAQs

How should I record “Information gaps, implications and controls before work”?

State what information is missing, why the work needs it and who will obtain it. Do not record an assumption as a confirmed survey result.

Is this the construction phase plan?

No. This records information needed to plan and design the work. The construction phase plan describes the arrangements for managing the construction work.

Can I mark missing information as not applicable?

Only where it genuinely does not apply, with an explanation. Use missing or requested where relevant information is not available.

Does uploading a document prove it is reliable?

No. Record its scope, revision and limitations, and resolve gaps through the responsible client and design team.

What are the limits of this template?

This is an information register and gap record. It does not replace the underlying surveys, drawings, existing health and safety file or competent design coordination.

Can I complete this form on site and share the record?

In the SiteSurvey app the form works offline, with signatures recorded against the questions. Share the completed record as a PDF or a link. Dates and action owners are recorded fields; this form does not send reminders or update other systems.