Skip to main content

Form library · Construction and handover

Sign installation checklist

An installation sign-off for signs. Record the permissions and consents and the access equipment, then add each sign: whether it went in as surveyed, the fixings, height, level and security, lighting tests and who connected it, removal of the old sign, after photos and any snag to return to. The form counts the snags, and the customer signs on the day. Every question is listed below, and you can fill the live form in on this page.

Ready to use from the form library, and every question is yours to edit. Trial from £1, cancel any time.

Try it on your phone

Try it on this phone

Fill in the sign installation on your phone now

See how the sign installation looks on your phone

Scan the code with your phone camera. It opens the real form, no sign-up needed.

Open the live example and fill it in, just as your team would on site. No sign-up needed.

See it on this phone

Every question is editable. Add this form to your account, then change the wording, add or remove questions and options, and make it fit your own jobs.

Or start your trial with this form ready →

Prefer paper? Download a printable copy: PDF or Word

One email, and we won't add you to a mailing list.

What should be checked when a sign is installed?

Check that each sign matches the approved survey and drawing, the fixings suit the wall and the sign's weight, it is level, plumb and secure at the right height, illuminated signs are connected and tested, the old sign is removed and the wall made good, and the site is left clean. Take after photos and get the customer's sign-off.

Last updated . Facts checked by the SiteSurvey team on 17 October 2026 against GOV.UK: outdoor advertisements and signs, a guide for advertisers (England) and HSE: safe use of ladders and stepladders.

Built for signing off a sign installation

Record each sign as its own row: where it went, the fixings, the height to its bottom edge, the lighting test and any snag. The form counts the snags to come back for.

Measure from photo on a phone with the reference choices A person, A door, A4 sheet and Something else, shown on a photo of a surveyor beside an oak

Height to the bottom of the sign

Photograph the shopfront with a door or a person below the sign and measure the height to its bottom edge from the photo. An illuminated sign needs to be at least 2.5 m up for deemed consent, and the form says so. It works on web forms in any phone browser today, and the app version is on its way.

How measuring from a photo works →
A Height (m) field filled in with 7.35, with the marked-up measuring photo as a thumbnail under it and a Remove photo button

The measuring photo stays with it

The marked-up photo is kept under the height answer and printed in the report after the measurement, so anyone can see how the figure was taken.

How measuring from a photo works →
The completed sign installation sign-off on a phone: a snag on the projecting sign, Add another sign, and Snags to return to 1, worked out

Snags counted for you

Mark a sign as a snag to return to and Snags to return to goes up by one, so the return visit is booked with the full list.

How calculated fields work →

A completed sign installation sign-off

Two signs fitted at a fictional coffee shop: a lit fascia sign at 2,650 mm, tested by an electrician, and a projecting sign at 2,600 mm, moved 150 mm to clear a downpipe bracket and left with one snag.

Try the sign installation form live

Answer a few questions and watch it adapt. Your answers are not saved, and any photos you add are deleted within the hour.

Live form: Signage Installation Sign-offOpen full screen ↗
See a filled-in example

Open the completed example to see fictional readings, notes, photos and calculations. Choose Blank form to try entering your own answers.

Want to see one filled in? See a completed sign installation report (PDF), made by SiteSurvey from a fictional site visit.

Every question in the sign installation template

A signage installation sign-off: each sign installed against the survey with its fixings, height, level, illumination and photos, removal and making good, consents and the customer's sign-off. 3 sections and 31 questions. Follow-up questions and guidance appear only when an answer calls for them, so the person on site never sees the ones that do not apply.

Make it your own: every question is editable

This is a starting point, not a fixed form. Once it is in your SiteSurvey account you can reword any question, add or remove questions, sections and answer options, and add your own logo, so it fits the way your team works and the jobs you do.

Details you only enter once

Add this form to a project in SiteSurvey and it fills in what the project already knows, so nobody on site retypes it and every form on the job uses the same names. Anything filled in can still be changed.

  • Project: the project name
  • Client: the project's customer
  • Site: the site, when the form is opened for a space or a product
  • Site address: the site address, from the space or the project

Job

  • ProjectShort answer
    Fills in from the project name
  • ClientShort answer
    Fills in from the project's customer
  • Site*Short answer
    Fills in from the site, when the form is opened for a space or a product
  • Site addressShort answer
    Fills in from the site address, from the space or the project
  • Installation date*Date
  • TimeTime
  • Installation team*Short answer
  • Survey or job referenceShort answer
  • Consents in placeTick all that apply
    • Landlord or site owner permission
    • Advertisement consent
    • Highway authority permission
    • None needed
  • GuidanceGOV.UK guide to outdoor advertisements (England): every sign needs the permission of the owner of the site, including the highway authority if it is on highway land. Some signs also need advertisement consent from the planning authority. Deemed consent for illuminated signs has limits and does not apply in conservation areas.
  • Access equipment usedTick all that apply
    • Ladder
    • Podium or tower
    • MEWP
    • Scaffold

Signs installed

  • Signs
    Repeat for each sign. Each one asks:
    • Sign reference*Short answer
    • LocationShort answer
    • Installed as surveyed and approved?Yes or No
    • What changed?Short answer
      Shown when “Installed as surveyed and approved?” is No
    • Fixings usedShort answer
    • Height to the bottom of the sign (mm)Number

      Deemed consent for an illuminated sign needs it to be at least 2.5 m up at its lowest point.

    • Level, plumb and secure?Yes or No
    • Illuminated?Yes or No
    • Lighting tested and working?Yes or No
      Shown when “Illuminated?” is Yes
    • Connected by (electrician)Short answer
      Shown when “Illuminated?” is Yes
    • CheckThe electrical connection of an illuminated sign must be certified by the electrician to BS 7671: an Electrical Installation Certificate for a new circuit, or a Minor Electrical Installation Works Certificate for work on an existing circuit. This sign-off does not replace that certificate.
      Shown when “Illuminated?” is Yes
    • Old sign removed and surface made good?Yes or No
    • Photos after installationPhotos
    • ResultChoose one
      • Complete
      • Snag to return to
    • SnagShort answer
      Shown when “Result” is “Snag to return to”
  • Snags to return toWorked out by the form

Sign-off

  • Site left clean and waste removed?Yes or No
  • Notes for the customerNotes
  • Customer nameShort answer
  • Customer signatureSignature
  • Installer name*Short answer
  • Installer signatureSignature

See it filled in

A completed sign installation report, made by SiteSurvey from a fictional site visit: every answer, the photos, the guidance that applied and the sign-off, ready to send as a PDF.

See completed form (PDF) ↗

Sign installation FAQs

What if the sign had to move on the day?

Answer that it was not installed as surveyed and record what changed, for example moved to clear a downpipe and agreed with the client on site. The record protects you if questions come up later.

Do I need consent for a new sign?

The GOV.UK guide for England says every outdoor sign needs the permission of the owner of the site, including the highway authority if it is on highway land. Some signs also need advertisement consent from the planning authority. The form records the permissions and consents in place.

What about illuminated signs?

Deemed consent for illuminated signs has limits: for example the sign must be at least 2.5 metres up at its lowest point, and it does not apply in conservation areas. The form records the height, that the lighting was tested and who connected it.

Can we work from a ladder?

HSE says ladders can be a sensible option for low-risk, short-duration tasks, but they should not automatically be your first choice. The form records the access equipment used.

How are snags handled?

Mark a sign as a snag to return to with what needs doing. The form counts the snags, so the return visit is clear.

Does it follow on from a sign survey?

Yes. Use the signage survey template to measure and photograph the elevation first, then this form for the installation, with the survey reference on it.