Elevation and gutter run
Show the building elevation and the visible gutter line from safe ground-level access. Identify the run and outlet location.
The rear elevation and continuous visible gutter run are shown.
Visual inspection library · Property maintenance
Show the whole rainwater route before focusing on a joint, outlet and downpipe. Give a repairer the location and visible evidence without claiming a flow test.
Hold to record. Keep holding while you film and speak; release to save the clip and its transcribed answer.
Four 9:16 example clips generated in Google Flow. Fictional inspection; no customer site is shown.

App-style example using Google Flow footage. The animated recording interface and gradually appearing words are scripted; no real inspection or live transcription took place.
The full visual example
Each short clip shows one point in the guided route. The footage is AI-generated and the observations are scripted examples, not findings from a real inspection.
Show the building elevation and the visible gutter line from safe ground-level access. Identify the run and outlet location.
The rear elevation and continuous visible gutter run are shown.
Frame a joint and adjacent gutter section in context, recording any visible sagging, separation or staining.
The gutter joint and adjacent roof edge are visible; support and seal condition cannot be confirmed from the clip.
Show the outlet from a safe position and record only debris or standing water that can actually be seen.
Leaf material appears near the visible outlet opening.
Follow the visible downpipe route and joints, recording any adjacent wall staining without inferring the cause.
The external downpipe route and joints are recorded against the brick elevation.
Identify the building and elevation. Record the visible run, then an accessible joint, outlet and downpipe route. Use safe ground-level views or authorised access only. This is a visual condition record. It does not prove internal blockage, leak rate, falls, fixing strength or the source of damp. Do not climb, lean out or work at height merely to collect footage.
Last updated . Facts checked on 9 October 2026 against NFRC-hosted · Mastic asphalt roofing maintenance and HSE · Assessing work at height.
A completed visual example
The six-page sample contains four inspection points, twelve footage stills, scripted observations and follow-up actions. The preview shows the first visual-evidence page.
Fictional sample. Footage was generated in Flow and observations are scripted; pages 3–4 contain still frames from all four clips.
Visual evidence · page 3 of 6 ↗The guided route
Identify the building and elevation. Record the visible run, then an accessible joint, outlet and downpipe route. Use safe ground-level views or authorised access only.
Show the building elevation and the visible gutter line from safe ground-level access. Identify the run and outlet location.
“The rear elevation and continuous visible gutter run are shown.”Scripted example, not a real finding.
Frame a joint and adjacent gutter section in context, recording any visible sagging, separation or staining.
“The gutter joint and adjacent roof edge are visible; support and seal condition cannot be confirmed from the clip.”Scripted example, not a real finding.
Show the outlet from a safe position and record only debris or standing water that can actually be seen.
“Leaf material appears near the visible outlet opening.”Scripted example, not a real finding.
Follow the visible downpipe route and joints, recording any adjacent wall staining without inferring the cause.
“The external downpipe route and joints are recorded against the brick elevation.”Scripted example, not a real finding.
How to use the record
Record the asset or site, visit stage, date and inspector. Keep each clip attached to its point and note anything inaccessible.
Say what the camera shows and where it is. Record the next action without guessing the cause or declaring a specialist result from video.
A material-specific roofing guide includes checking gutters and outlets for debris and drainage concerns. NFRC-hosted · Mastic asphalt roofing maintenance ↗
This is a visual condition record. It does not prove internal blockage, leak rate, falls, fixing strength or the source of damp. Do not climb, lean out or work at height merely to collect footage.
Questions, answered
No. It can show visible debris or overflow signs, but internal blockage and flow need separate checks.
No. Plan any work at height under an appropriate risk assessment and use suitable access; ground-level footage can record access limits.
No. Record the location and appearance, then investigate the cause separately.
A fictional elevation record with four visual points, clip stills, observations, follow-up actions and limitations.
Guidance checked 9 October 2026. The four-point route is a SiteSurvey example, not a method prescribed by these sources.
A material-specific roofing guide includes checking gutters and outlets for debris and drainage concerns.
Explains planning and risk assessment before work at height.
Search research: Keywords Everywhere estimated 390 UK monthly searches for “gutter inspection” when checked 9 October 2026. Broad UK query spanning cleaning services, home advice and surveys; software buyer demand is unverified. This is not a traffic or conversion forecast.
SiteSurvey Walk Cam explains the product capability. The clips are AI-generated examples.